Grain vacation device on the railway

SOIL STABILIZATION
Category
Commercial building
FOCUS
Soil stabilization
LOCATION
Kiev, Ukraine
DATE/YEAR
2019
TECHNOLOGY
Deep Injection

A set of works to stabilize the soil at the base of part of the foundations of the dispensing device for grain on the railway and at the base of the foundations of railway scales.

The reason for petition
The instability of the railway scales

Problem
Uncompacted soil during site planning, high groundwater level

Work done
- Stabilization of the soil at the base of the foundations of railway scales;

- Soil stabilization at the base of part of the foundations of the grain dispensing device on the railway

Applicable Methods
Deep Injection.

Scope of work
- Stabilization of the soil at the base of the foundations of a railway scale with a capacity of 2.80 m;

- Ground stabilization at the base of part of the foundations of the grain dispensing device on the railway with a capacity of 1.30 m

The work was performed without stopping the operation of the building.

If you didn’t find an object or a situation similar to yours in the portfolio on the website, then order a specialist to select a project to analyze the pros and cons of technologies from the extensive database of completed Uretek projects.
Back to projects
Leave a comment or ask a question
Standard projects and cost
Leave a comment
Comments
Задай вопрос эксперту Uretek

Присылайте нам ваши вопросы и мы ответим на страницах нашего ТехноБлога

Address:
Kiev, Berkovetskaya St., 10
Thanks for your comment!
To close

Leave your phone
and our consultant will contact you

Choose a convenient time to call
  • Services
  • Technologies
  • Portfolio
  • Technoblog
  • About us
  • Contacts
  • +8 800 33 65 15
    Uretek